Brian M Dube | 1 Dec 2010 06:16
Picon
Favicon

Re: please add your PGP key

On Wed, Dec 01, 2010 at 12:03:19AM +1100, David Crossley wrote:
> Please add your PGP key to the Forrest KEYS file.

If any developers are interested in signing keys in the Seattle area,
feel free to contact me.

Brian

Juan Jose Pablos | 1 Dec 2010 11:07
Picon
Favicon

Re: please add your PGP key

El 30/11/10 14:03, David Crossley escribió:
> Please add your PGP key to the Forrest KEYS file.
>
> See http://forrest.apache.org/procedures/release/How_to_release.html
> and "Find in Page" KEYS
>
> -David
>
Hi David,

Mine is there... do you want me to update to this one:

http://pgp.mit.edu:11371/pks/lookup?op=get&search=0xCD53A63D5CE5BDF9

David Crossley | 7 Dec 2010 03:31
Picon
Favicon

BarCamp Apache Sydney 2010

The first BarCamp Apache Sydney is on this weekend
Friday night and all day Saturday:
http://barcamp.org/BarCampApacheSydney

Some Forrest people will be there.

-David

David Crossley | 7 Dec 2010 06:59
Picon
Favicon

[Proposal] Release Plan for Forrest 0.90

Here is my proposal for the Release Plan. After a discussion
period, we will vote on this Release Plan.

Aiming for a release date of 17 January 2011 [4].

Please check with your time schedules and comment. We want to
have as many people available as possible to test the release
candidate. So we can adjust the time schedule a bit to suit.

For background info on this step and on the release process
in general, see
http://forrest.apache.org/procedures/release/How_to_release.html#PrepRelPlan

------------------------
The minimum Java version for this release is Java 1.5

------------------------
I will be the Release Manager.

People can help with various aspects of the release process. See [9].
People can also help between now and then to prepare the codebase.

------------------------
For Plugins, see the proposal below.

------------------------
The phases are:

Voting to accept the Release Plan ends on:
Monday 2010-12-20 at 22:00 UTC [1].
(Continue reading)

Forrestbot | 7 Dec 2010 15:04
Picon

ForrestBot build for forrest-seed FAILED

Automated build for forrest-seed FAILED
Log attached.

----------
Forrestbot run ended at 07 December 02:04 PM
Using Forrest 0.9-dev
Forrestbot administrator: Forrest developers
----------

     [echo] 
          ....... Forrest render START 2010-12-07 02:04:03
          ... Rendering docs in /home/forrest/config/forrestbot-trunk/conf/work/forrest-seed

check-java-version:
     [echo] This is apache-forrest-0.9-dev
     [echo] Using Java 1.6 from /usr/local/jdk1.6.0/jre
     [echo] Using Apache Ant version 1.7.1 compiled on September 26 2008 from /home/forrest/sources/forrest-trunk/tools/ant

init-props:
    [mkdir] Created dir: /home/forrest/config/forrestbot-trunk/conf/work/forrest-seed/tmp

echo-settings-condition:

echo-settings:

check-skin:

init-proxy:

fetch-skins-descriptors:
(Continue reading)

David Crossley (JIRA | 8 Dec 2010 09:07
Picon
Favicon

[jira] Created: (FOR-1208) NPE exception when generating PDF that includes SVG to PNG image conversion

NPE exception when generating PDF that includes SVG to PNG image conversion
---------------------------------------------------------------------------

                 Key: FOR-1208
                 URL: https://issues.apache.org/jira/browse/FOR-1208
             Project: Forrest
          Issue Type: Bug
          Components: Core operations, Plugin: output.pdf
    Affects Versions: 0.9-dev
            Reporter: David Crossley

The "seed-sample" site has two examples of converting to PNG from SVG at linking.html#images

This works okay with HTML output. It is also okay with PDF output. The images are generated.

However with the PDF, there is also a NullPointerException

To stop it, comment-out the two examples for "ellipse".

--

-- 
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.

David Crossley (JIRA | 8 Dec 2010 09:15
Picon
Favicon

[jira] Updated: (FOR-1208) NPE exception when generating PDF that includes SVG to PNG image conversion


     [
https://issues.apache.org/jira/browse/FOR-1208?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

David Crossley updated FOR-1208:
--------------------------------

    Attachment: 1208_npe.txt

The build is still successful.

However the NPE comes to standard output which is rather alarming.

See the attachment 1208_npe.txt

> NPE exception when generating PDF that includes SVG to PNG image conversion
> ---------------------------------------------------------------------------
>
>                 Key: FOR-1208
>                 URL: https://issues.apache.org/jira/browse/FOR-1208
>             Project: Forrest
>          Issue Type: Bug
>          Components: Core operations, Plugin: output.pdf
>    Affects Versions: 0.9-dev
>            Reporter: David Crossley
>         Attachments: 1208_npe.txt
>
>
> The "seed-sample" site has two examples of converting to PNG from SVG at linking.html#images
> This works okay with HTML output. It is also okay with PDF output. The images are generated.
(Continue reading)

David Crossley (JIRA | 8 Dec 2010 09:27
Picon
Favicon

[jira] Commented: (FOR-1208) NPE exception when generating PDF that includes SVG to PNG image conversion


    [
https://issues.apache.org/jira/browse/FOR-1208?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=12969247#action_12969247
] 

David Crossley commented on FOR-1208:
-------------------------------------

This NPE started appearing after upgrade to FOP-0.95 which happened while the upgrade to Cocoon-2.1 was happening.

http://s.apache.org/X3j
Re: [STATUS] [heads-up] merging our branch Cocoon-2.1
Date: 2008-09-12

Note that discussion confused this NPE with an adjacent issue about "icon-b". My investigation today
proved that they are not related.

> NPE exception when generating PDF that includes SVG to PNG image conversion
> ---------------------------------------------------------------------------
>
>                 Key: FOR-1208
>                 URL: https://issues.apache.org/jira/browse/FOR-1208
>             Project: Forrest
>          Issue Type: Bug
>          Components: Core operations, Plugin: output.pdf
>    Affects Versions: 0.9-dev
>            Reporter: David Crossley
>         Attachments: 1208_npe.txt
>
>
(Continue reading)

Tim Williams | 8 Dec 2010 14:37
Picon

Re: [Proposal] Release Plan for Forrest 0.90

Thanks David!  I'm in the midst of a double move - once to temporary
housing; then a couple weeks later, to the new house - and some other
rather large life-changes during this period but I'll certainly pitch
in as much as possible.  I could be more involved if all the dates
shifted by 2-3 weeks but if this works best for your schedule, I'll do
everything I can to support it.

--tim

On Tue, Dec 7, 2010 at 12:59 AM, David Crossley <crossley <at> apache.org> wrote:
> Here is my proposal for the Release Plan. After a discussion
> period, we will vote on this Release Plan.
>
> Aiming for a release date of 17 January 2011 [4].
>
> Please check with your time schedules and comment. We want to
> have as many people available as possible to test the release
> candidate. So we can adjust the time schedule a bit to suit.
>
> For background info on this step and on the release process
> in general, see
> http://forrest.apache.org/procedures/release/How_to_release.html#PrepRelPlan
>
> ------------------------
> The minimum Java version for this release is Java 1.5
>
> ------------------------
> I will be the Release Manager.
>
> People can help with various aspects of the release process. See [9].
(Continue reading)

David Crossley | 9 Dec 2010 02:00
Picon
Favicon

Re: [Proposal] Release Plan for Forrest 0.90

Tim Williams wrote:
> Thanks David!  I'm in the midst of a double move - once to temporary
> housing; then a couple weeks later, to the new house - and some other
> rather large life-changes during this period but I'll certainly pitch
> in as much as possible.  I could be more involved if all the dates
> shifted by 2-3 weeks but if this works best for your schedule, I'll do
> everything I can to support it.

Lets shift the main dates by three weeks.

However i would like to keep the Release Plan vote as-is,
i.e. next week. I want to spread the word about a firm
plan of action.

All the best with your new opportunities.

-David


Gmane