Eugène Sandford | 24 Apr 03:52
Picon

Planner-list Invitation to connect on LinkedIn

 
 
 
 
From Eugène Sandford
 
Head at Information Office of French Polynesia
French Polynesia
 
 
 

I'd like to add you to my professional network on LinkedIn.

- Eugène

 
 
 
 
 
 
You are receiving Invitation to Connect emails. Unsubscribe
© 2012, LinkedIn Corporation. 2029 Stierlin Ct. Mountain View, CA 94043, USA
 
_______________________________________________
planner-list mailing list
planner-list@...
http://mail.gnome.org/mailman/listinfo/planner-list
Ann Marie Rubin | 9 Apr 16:51
Picon
Favicon

Planner-list need help entering project start date earlier than current date

Hello,

I'm using Planner 0.14.4 on REL 6.  I need to import an existing project schedule from Microsoft Project to Planner.  The MS project has been exported as an XML file. I can import the file, but the project start date is 11-28-11.  When I import the file, the project displays a start date of the current date.

So I tried creating a new schedule (attached).  The task start date is 11-28-11 but the displayed start date is Apr 9, which is today's date.

Is there a way to get Planner to recognize and display a project start date earlier than the current date?  If not, how can you import an existing project that is already underway?

Thanks,

Ann Marie


--
Ann Marie Rubin, PMP
Engineering Program Manager
Red Hat, Inc.
arubin-H+wXaHxf7aLQT0dZR+AlfA@public.gmane.org
Phone: 978.392.3959
Fax: 978.392.3984
Attachment (testproject.planner): application/xml, 1733 bytes
_______________________________________________
planner-list mailing list
planner-list@...
http://mail.gnome.org/mailman/listinfo/planner-list
Alexandre Franke | 2 Apr 15:42
Picon

Re: Planner-list planner version 0.14-6

On Mon, Apr 2, 2012 at 1:55 PM, frank <fnk2030@...> wrote:
> I used firstly the command below and after i used the process as compile
> manually.
> but both case, always had problem.
> the problem is "fragmentation fail".

I guess it's "segmentation fault". If even the package from Ubuntu
fails, then I guess something is wrong on your system. Please file a
bug on Launchpad to let the Ubuntu devs know.
https://bugs.launchpad.net/ubuntu/+source/planner/+filebug

Also please try to provide a trace.
https://live.gnome.org/GettingTraces

--
Alexandre Franke
star monkey | 18 Mar 13:40

Planner-list v0.14.6 Installer for Windows?

Hi Guys,

Was wondering if anyone's able to prepare/update the windows build of Planner? That would be most awesome.

// SM
_______________________________________________
planner-list mailing list
planner-list@...
http://mail.gnome.org/mailman/listinfo/planner-list
Emil Zettergren | 8 Mar 17:02
Picon

Planner-list Changing language

Hi!

I can't change the language... I did it once before, and now that I was going to re-install the program, I can't find out how to do it. Any suggestions, please?

_______________________________________________
planner-list mailing list
planner-list@...
http://mail.gnome.org/mailman/listinfo/planner-list
Bruno Cauville | 14 Feb 17:56

Planner-list Did someone build a windows version of planner v0.14.6 ?

 

 

 

_______________________________________________
planner-list mailing list
planner-list@...
http://mail.gnome.org/mailman/listinfo/planner-list
Patrick Healy | 24 Jan 12:42
Picon
Favicon

Planner-list pdf window size

Hello,

I'm running planner (GNOME planner 0.14.4) and I'd like to include the
Gantt chart as a figure in a LaTeX document.

My problem is that eventhough the number of tasks is quite small, the
pdf output is a full A4 page and for page limitatino reasons I can't afford
to give up a full page for the figure.  I have tried playing with custom
page sizes but this seems to scale things proportionally, unless I am
using it wrongly.  Is there any way of printing a small-ish no. of tasks
in a "fit to size" window?

Otherwise, thanks for a very nice program.

Paddy Healy
--

-- 
http://goo.gl/pyor
Jérôme VÉRITÉ | 20 Jan 15:13

Planner-list start date for HTML export

Hi,


I try to export a project to the HTML view with a specified start date in the project properties but the export start date is today instead of the specified date.

Do you know how I can obtain a correct HTML export ?

I'm using version 0.14.5.

Thanks a lot

--
Jérôme
_______________________________________________
planner-list mailing list
planner-list@...
http://mail.gnome.org/mailman/listinfo/planner-list
Thibaut Paumard | 9 Jan 14:34
Picon

Planner-list Mac OS X (Snow Leopard) package

Hi,

Just to mention, I have built Planner for Snow Leopard. It's an
experimental, little tested package: expect failure.

Nevertheless, it may well be functional after all. If you use the
package and it works for you, please let me know. If it doesn't work,
please let me know, too :-)

http://www.lesia.obspm.fr/perso/thibaut-paumard/

Regards, Thibaut.
jordi.valls | 2 Jan 08:53

Planner-list Planner file : open error

Dear all,

 

Since Friday , i don’t make any chande in my planner file, and when i open this file today , a message alert me : “Couldn't find a suitable file module for loading” .. I have a critical information in this module, and I can’t use this software if this errors don’t let me to continue.

 

Please, help me, it’s very important to solve this problem

 

Thks for all!

 

Jordi

 

 

Jordi Valls i Ferrer
-----------------------
Ajuntament de Girona
Àrea d’Alcaldia / Presidència
Oficina de Comunicació
A/e: jordi.valls-ofJMSQCG/lCr8tq0KR2Zig@public.gmane.org
Tel.: 972 419 430
Tel. intern: 1526
www.girona.cat

 

_______________________________________________
planner-list mailing list
planner-list@...
http://mail.gnome.org/mailman/listinfo/planner-list
Picon

Planner-list congratulations and suggestion

firs of all sorry for my inglish, im from argentina and use google 
translate :)
congratulations for this amazing piece of software, the only suggestion 
(if not already and do not see) i have is:
the possibility of see as a column in gantt mode the predecesores wbs of 
a work.
This can be very usefull in case of scheduling works with many chained 
wbs or make change of order to improve the final work
example, scheduling a work to go see that a wbs soon becomes as critical 
and not dependent on those above, then move this one to start earlier, 
but in doing so I have to start reviewing all units that changed places 
and it would be much easier if these dependencies appear as a column.
thanks.

if somebody know spanish, this is the originally :)
en primer lugar, lo siento por mi Inglés, soy de Argentina:)
felicitaciones por esta increíble pieza de software, la única sugerencia 
(si es está y no la veo) que tengo es:
la posibilidad de ver como una columna en el modo de Gantt de los 
predecesores wbs de una obra.
  Esto puede ser muy útil en el caso de programar de obras con muchos 
wbs encadenados o hacer un cambio de orden para mejorar el trabajo final.
ejemplo: al ir programando una tarea veo que una de pronto se convierte 
en critica y como no depende de las que estan arriba la muevo para que 
empiece antes, pero al hacer esto tengo que empezar a revisar las 
dependencias de todas las que cambiaron de lugar y seria mucho mas facil 
si estas dependencias aparecieran como una columna.
Gracias

--

-- 